Renovate Building 223
Minneapolis, Minnesota

Contracting Method: Design-Build
Building Use: Medical Facility
Completion Date: December 2023
Project Summary:
We served as the prime contractor for the renovation of Building 223 at the Minneapolis VA Medical Facility. This $5.8 million project, from August 2021 to December 2023, involved transforming the building into a specialized storage facility with precise environmental controls. The renovation highlights our ability to manage complex healthcare projects with stringent requirements, delivering a facility optimized for pandemic preparedness and logistics. For more information or inquiries, please contact us!
We served as the prime contractor for the renovation of Building 223 at the Minneapolis VA Medical Facility. This $5.8 million project, from August 2021 to December 2023, involved transforming the building into a specialized storage facility with precise environmental controls. The renovation highlights our ability to manage complex healthcare projects with stringent requirements, delivering a facility optimized for pandemic preparedness and logistics. For more information or inquiries, please contact us!
Scope of Work:
This project involved the comprehensive renovation of Building 223 at the Minneapolis VA Medical Facility to create a specialized storage facility for pandemic preparedness and logistics. The renovation required precise coordination to meet functional and environmental standards, transforming the building into three distinct areas with specific purposes.
Challenges & Solutions
- Precise environmental controls to meet specific temperature and ventilation requirements
- Comprehensive design and execution to ensure the facility meets the unique demands of pandemic preparedness
- Coordination of multiple trades and systems to maintain the integrity of the storage facility during renovation
Areas Covered:
- Plan West Section: Semi-Conditioned Storage Space for Facilities Engineering
- Installed a minimal heating system and enhanced ventilation for temperature control, ensuring the space remains above 40°F.
- Plan East Section: Conditioned Storage Space for Logistics
- Converted into a space with temperatures maintained between 60°F in the winter and below 80°F in the summer, outfitted with pallet racking for efficient storage.